Location

Manisa

Type of Mounting

Industrial Roofing

Installed Power (kWp)

1.102,08

Annual Targeted Production (kWh/year)

1.526.000

Planned Production (kWh/kWp/year)

1.384

Targeted Performance Ratio PR(%)

80,63%

Commissioning Date

December 2022