Location

Manisa

Type of Mounting

Industrial Roofing

Installed Power (kWp)

747,84

Annual Targeted Production (kWh/year)

1.036.000

Planned Production (kWh/kWp/year)

1.385

Targeted Performance Ratio PR(%)

80,68%

Commissioning Date

October 2022