Location

Manisa

Type of Mounting

Land

Installed Power (kWp)

3.203,20

Annual Targeted Production (kWh/year)

5.196.525

Planned Production (kWh/kWp/year)

1.622

Targeted Performance Ratio PR(%)

82,97%

Commissioning Date

February 2025