Location

Manisa

Type of Mounting

Industrial Roofing

Installed Power (kWp)

21,36

Annual Targeted Production (kWh/year)

29.690

Planned Production (kWh/kWp/year)

1.390

Targeted Performance Ratio PR(%)

80,80%

Commissioning Date

November 2021