Location

Malatya

Type of Mounting

Industrial Roofing

Installed Power (kWp)

2.989,35

Annual Targeted Production (kWh/year)

4.468.000

Planned Production (kWh/kWp/year)

1.495

Targeted Performance Ratio PR(%)

82,56%

Commissioning Date

August 2023