Location

Manisa

Type of Mounting

Industrial Roofing

Installed Power (kWp)

746,95

Annual Targeted Production (kWh/year)

1.048.000,00

Planned Production (kWh/kWp/year)

1.403

Targeted Performance Ratio PR(%)

82,21%

Commissioning Date

December 2022